|
Product Details:
|
|
| Place of Origin: | China |
|---|---|
| Brand Name: | Glawall |
| Certification: | SGS, ISO 9001,UL, CE |
| Model Number: | 100mm ultrahigh style |
|
Payment & Shipping Terms:
|
|
| Minimum Order Quantity: | 10 square meters |
| Price: | US$80.00 10 - 99 square meters |
| Packaging Details: | wooden package |
| Delivery Time: | 2-3 weeks |
| Payment Terms: | L/C,D/A,D/P,T/T,Western Union |
| Supply Ability: | 3000 square maters per month |
|
Detail Information |
|||
| Material: | Aluminum Frame+glass Panel | Transparency: | Clear |
|---|---|---|---|
| Customizable: | Size, Accessories | Competitive Price: | Yes |
| Panel Thickness: | 60mm, 100mm | Glass Type: | Strong Tempered Glass |
| Frame Material: | Aluminum | Advantage: | Competitive Price, Good Service, High Professional, Quality Guarantee |
| Highlight: | Aesthetic Appeal Movable Solid Partition Wall,Customized Movable Solid Partition Wall |
||
Product Description
![]()
How to Install a Ceiling-Mounted Movable Partition Wall
Installing a ceiling-mounted movable partition requires precise alignment, proper structural support, and careful assembly to ensure smooth operation. Below is a step-by-step guide for professional installation.
| 1. Pre-Installation Preparation | ✔ Structural Assessment | Confirm the ceiling can support the partition’s weight (consult an engineer if needed). | |
| Check for obstructions (ducts, beams, lighting) that may interfere with the track. | |||
| Ensure the floor is level (critical for proper alignment). | |||
| ✔ Tools & Materials Needed | Tools | Materials | |
| Laser level | Ceiling track system | ||
| Drill & anchors | Partition panels | ||
| Measuring tape | Trolleys/carriers | ||
| Lifting equipment | Acoustic seals | ||
| Screwdrivers & wrenches | Motorized drive (if automated) | ||
![]()
2. Step-by-Step Installation Process
| Step 1: Mark the Track Position | Use a laser level to mark a straight guideline where the track will be installed. |
| Measure panel widths to ensure proper alignment. | |
| Step 2: Install the Ceiling Track | For concrete ceilings: Use heavy-duty anchors (wedge or sleeve anchors). |
| For steel structures: Bolt directly into steel beams or use unistrut channels. | |
| For suspended ceilings: Reinforce with backing bars or a secondary support frame. | |
| Step 3: Mount the Trolleys/Carriers | Attach rolling trolleys to the track at designated intervals (usually every 1-1.5m). |
| Ensure they move smoothly before attaching panels. | |
| Step 4: Lift & Hang the Partition Panels | Use a panel lift or suction handles to safely position panels. |
| Secure panels to the trolleys using hanger brackets. | |
| Check for plumb alignment (panels should hang straight without tilting). | |
| Step 5: Install Bottom Guides (If Needed) | Some systems use floor guides (not full tracks) to prevent swaying. |
| Ensure guides allow smooth movement without friction. | |
| Step 6: Add Seals & Finishing | Install acoustic seals (top, sides, and bottom) for soundproofing. |
| Cover track edges with trim pieces for a clean look. | |
| Step 7: Test & Adjust | Manually slide panels to check for smooth movement. |
| Adjust trolley tension if panels drag or wobble. | |
| For motorized systems, test remote controls & sensors. |
![]()
3. Key Considerations for Ceiling-Mounted Systems
✔ Weight Support Requirements
| Partition Type | Approx. Weight per m² |
| Glass partitions | 25-40 kg |
| Solid acoustic panels | 30-50 kg |
| Double-glazed glass | 50-80 kg |
➔ Ceiling must handle 2-3x the partition’s total weight for safety.
✔ Movement Systems Comparison
| Type | Best For | Pro | Cons |
| Manual push-slide | Light partitions, small spaces | Low cost, simple | Harder to move heavy panels |
| Motorized | Heavy/extra-high walls | Smooth, automated | Higher cost, needs power |
| Magnetic levitation | Ultra-smooth movement | Silent, minimal friction | Expensive, rare |
✔ Common Mistakes to Avoid
Uneven track installation → Causes jamming
Insufficient ceiling support → Risk of collapse
Poor panel alignment → Gaps in soundproofing
Skipping test runs → Operational failures
![]()
4. Maintenance Tips
Lubricate tracks annually with silicone spray.
Check hanger bolts for loosening over time.
Clean seals to maintain acoustic performance.
Conclusion
Ceiling-mounted movable partitions offer a clean, floor-track-free solution for modern spaces. Proper installation ensures smooth operation, durability, and sound control.
Need recommendations for track systems or motorized drives? Let me know your project specs!
![]()
![]()
Enter Your Message