Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | Glawall |
Certification: | SGS, ISO 9001,UL, CE |
Model Number: | 100mm ultrahigh style |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 10 square meters |
Price: | US$80.00 10 - 99 square meters |
Packaging Details: | wooden package |
Delivery Time: | 2-3 weeks |
Payment Terms: | L/C,D/A,D/P,T/T,Western Union |
Supply Ability: | 3000 square maters per month |
Detail Information |
|||
Material: | Aluminum Frame+glass Panel | Transparency: | Clear |
---|---|---|---|
Customizable: | Size, Accessories | Competitive Price: | Yes |
Panel Thickness: | 60mm, 100mm | Glass Type: | Strong Tempered Glass |
Frame Material: | Aluminum | Advantage: | Competitive Price, Good Service, High Professional, Quality Guarantee |
Product Description
Installation Guide for Extra-High Movable Partition Walls (4m+ Height)
Installing extra-high movable partition walls (4 meters or taller) requires careful planning, structural reinforcement, and precision to ensure smooth operation and long-term stability. Below is a step-by-step guide for professional installation.
1. Pre-Installation Planning | |
A. Site Assessment & Measurements | Verify ceiling height and ensure the space can accommodate the partition system. |
Check floor and ceiling load-bearing capacity (extra-high walls are heavier). | |
Identify obstructions (beams, HVAC ducts, lighting fixtures) that may interfere with tracks. | |
B. Design & Engineering | Custom-track design (straight, curved, or corner-turning) based on space requirements. |
Decide between ceiling-hung, floor-supported, or dual-track systems (recommended for heights >5m). | |
Decide between ceiling-hung, floor-supported, or dual-track systems (recommended for heights >5m). | |
C. Required Tools & Materials | ✔ Laser level & measuring tools |
✔ Heavy-duty drill & anchors | |
✔ Track system (aluminum/steel) | |
✔ Motorized drive system (if automated) | |
✔ Sealants & acoustic gaskets | |
✔ Lifting equipment (for large panels) |
2. Installation Steps | ||
Step 1: Ceiling & Floor Preparation | For ceiling-hung systems | Reinforce the ceiling with steel backing or additional supports. |
For floor-supported systems | Ensure a perfectly level floor; use shims if needed. | |
For dual-track systems | Both ceiling and floor must be aligned precisely. | |
Step 2: Track Installation | Straight tracks | Mount the upper track first using laser leveling for perfect alignment. |
Secure with heavy-duty anchors (concrete or steel). | ||
Install lower guide track (if floor-supported). | ||
Curved/corner tracks | Requires custom-engineered curved rails. | |
Test movement before panel installation. | ||
Step 3: Panel Installation | Use a panel lift or suction handles to safely position tall panels. | |
Attach panels to the trolleys/hangers in the track. | ||
Ensure panels interlock properly for acoustic sealing. | ||
Step 4: Motorization & Automation (If Applicable) | Install motorized drive units (chain, belt, or gear-driven). | |
Set up control systems (remote, touch panel, or smartphone app). | ||
Test safety sensors (obstruction detection, emergency stop). | ||
Step 5: Sealing & Finishing | Apply acoustic seals (top, bottom, and between panels). | |
Install end caps and covers for a clean finish. | ||
Test multiple opening/closing cycles for smooth operation. |
3. Post-Installation Checks
✅ Structural Stability – No wobbling or misalignment.
✅ Smooth Movement – No jerking or sticking.
✅ Soundproofing Test – Check for air gaps or leaks.
✅ Safety Features – Sensors and emergency stop working.
4. Common Challenges & Solutions
Issue | Solution |
Panel misalignment | Recheck track leveling with a laser. |
Motor jamming | Ensure proper voltage and lubrication. |
Noise during movement | Adjust rollers or replace worn bearings. |
Gaps in soundproofing | Add extra seals or adjust panel alignment. |
5. Maintenance Tips
Lubricate tracks & rollers annually.
Inspect seals for wear and tear.
Test automation systems periodically.
Conclusion
Installing extra-high movable partition walls requires precision engineering, reinforced structures, and professional handling. When done correctly, they provide seamless, soundproof, and automated space division for large venues.
Need a recommended supplier or detailed technical specs? Let me know!
Enter Your Message