Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | Glawall |
Certification: | SGS, ISO 9001,UL, CE |
Model Number: | framed |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 10 square meters |
Price: | US$80.00 10 - 99 square meters |
Packaging Details: | wooden package |
Delivery Time: | 2-3 weeks |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union |
Supply Ability: | 3000 square maters per month |
Detail Information |
|||
Trade Term: | CIF, FOB, EXW, DDP | Sound Proof: | Yes |
---|---|---|---|
Our Type: | Factory | Material: | Aluminum, Tempered Glass |
After Sales Service: | Yes | Package: | Nice Package |
Our Brand: | Glawall | Color Support: | Every Color |
Delivery Way: | Door To Door Or Ship To Port | Product: | Glass Wall Partition |
High Light: | Demountable glass partition wall,Sustainable Modular Office Walls,Eco-Friendly Sustainable Modular Office Walls |
Product Description
Eco-Friendly Sustainable Modular Office Walls
Demountable office walls are designed for sustainability. Over 90% of the wall components are able to be reused when moving, making demountable walls and glass storefront partitions an economical and eco-friendly alternative to traditional drywall construction. Demountable walls include a track and stud system with wall panels that snap together.
Adaptable solutions
|
Our way of working has changed tremendously over the years. Flexibility became a vital element and now we expect the same from our working environment. Different times ask for different solutions, based on innovative ideas and concepts. Our room-in-room solutions are designed to offer employees a safe, pleasant, and efficient space to work, connect, meet, perform and create. Customizable walls
|
Customizable walls
|
Installation – The next most important step you can take to ensure that your office wall partitions remain in excellent working order is to have them installed by a team of fully experienced and qualified professionals. Our products are easy to install. We will pre-assemble them in the factory, which means our workers will assemble what can be assembled first, reducing the installation steps for customers after receiving the goods.
1:What you should you do on site?
A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.
2:How to install?
We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.
3:How about lead time ?
The lead time is 15 days to 21days.
4:How to transport?
Sea transport is a common mode of transportation.In an emergency,can be air freight.
5:How do the goods packing?
Carton paper package ,MDF batten cover all around cotner.
6:What is procurement procedure?
Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall)
Secondly, we offer you the movable wall layout drawings for your confirmation.
Factory address: No.3 Sanheng Road, Xiqiao Industrial Zone, Shatou Village, Jiujiang Town, Nanhai District, Foshan City, Guangdong Province.
Welcome to visit our factory
Enter Your Message